NOTE: Projects are listed by number and bids on some projects may have already been opened. Projects will be removed from this list two months after award of contract. The University encourages responses from small and disadvantaged, minority and women-owned firms. If you participated in a recent bid solicitation, please consider completing our bid survey to help us evaluate and determine ways to improve our bid process. |
(Every
attempt has been made to ensure accuracy and reliability of the data contained
in the information provided on this web page and attachments hereto. In
addition, information is constantly being added and/or updated.
![]()
CL-668 DAVIS
HALL ROOF REPLACEMENT
Project description: The General Contractor is the
single prime contractor for this project.
The General Contractor’s work includes all work for the project. The work includes, but is not necessarily
limited to the following: Contractor shall remove existing roofing membrane,
roof insulation and all terminations and flashing indicated on drawings.
Contractor shall provide all disposal and recycling of demolition materials and
new construction waste as much as is feasible. Provide new EPDM membrane
roofing system with new vapor barrier, roof insulation as well as all new
terminations and applicable details as indicate
Pre-bid Conference: May 12, 2008 10:00 a.m.
Location: McEntire Conference Room
Bids Due and Opened: May 28, 2008 2:00 p.m.
Deliver To: 16
McEntire Building, Main Campus
Additional Information: Notice
to Contractors
Bidders
List
Addenda
Bid
Tabulation
CL-671 PARKING LOT –
Project
description: This project is to provide construction
of parking lots reaching from
Pre-bid Conference: May 6, 2008 10:00 a.m.
Location: McEntire Conference Room
Bids Due and Opened: May 19, 2008 2:00 p.m.
Deliver To: 16
McEntire Building, Main Campus
Additional Information: Notice to Contractors
Addenda No. 1 Issued May 15, 2008
Addenda No. 2 Issued May 16, 2008
Bid Tabulation
CL-660 STILL HALL DATA
EMERGENCY GENERATOR
Project description: The Electrical Contractor is the
single prime contractor for this project.
The Electrical Contractor’s work includes all work for the project. The work includes, but is not necessarily
limited to the following:
Demolition of existing diesel engine generator, fuel tank, and cap
existing exhaust pipe. Remove exhaust pipe in its entirety and patch all openings with
watertight materials. The existing transfer switch and
panelboard and circuiting shall remain. Furnishing and installing of all new exterior
pad mounted generator in sound attenuation weatherproof housing, fuel tanks,
transformers, automatic transfer switches, panelbaords,
conduit, and feeders and circuiting.
Provide exterior concrete generator mounting pad along with all
associated excavating, trenching, and back filling. Also included is new concrete service walkway
around the generator as indicated on the drawings. Provide all materials necessary to connect
remote generator status panel with existing campus wide Johnson Controls Metasys system to indicate trouble signal (generator did
not start) to maintenance, public safety and boiler house monitors. The Contractor shall provide all anchoring
bolts and materials necessary to secure the generator and its weather proof
housing to the generator pad
Pre-bid Conference: April 29, 2008 10:00 a.m.
Location: McEntire Conference Room
Bids Due and Opened: May 13, 2008 2:00 p.m.
Deliver To: 16
McEntire Building, Main Campus
Additional Information: Notice to Contractors
Addenda No. 1 Issued April 30, 2008
![]()
CL-657 FRAME
& RHOADES HALL – FACILITY LOCKER ROOM/RESTROOM UPGRADE
Project description: This Project is to provide interior renovations
(Locker Room and Restroom) at specific areas at both Frame and Rhoades Hall, at
the Venango Campus,
Pre-bid Conference: April 9, 2008 1:00 p.m.
Location: Rhoades Conference Room, Venango Campus,
Bids Due and Opened: April 23, 2008 2:00 p.m.
Deliver To: 16
McEntire Building, Main Campus
Additional Information: Notice
to Contractors
Addenda No. 1 Issued: April 15, 2008
Addenda No. 2 Issued: April 17, 2008
Addenda No. 3 Issued: April 17, 2008
CL667
– KEELING
Project
description: The General Contractor is the
single prime contractor for this project.
The General Contractor’s work includes all work for the project. The work includes, but is not necessarily
limited to the following:
Contractor shall remove existing windows and associated caulking,
shims, and exterior metal sill material at locations indicated on drawings.
Contractor shall provide all disposal and recycling of demolition materials and
new construction waste as much as is feasible. Provide new aluminum windows,
shims, caulking, and exterior aluminum sill as indicated. Remove and reinstall or replace existing wood
trim at window heads and jambs as necessary for window replacement, paint to
match existing. If necessary for window
installation – remove, clean and re-install window blinds.
Pre-bid Conference: March
17, 2008 10:00 a.m.
Location: McEntire
Conference Room
Bids Due and Opened: March 31, 2008 2:00 p.m.
Deliver To:
Additional Information: Notice to Contractors
Addenda Issued: March 18, 2008
CL-627
- RENOVATE HVAC,
Project description:
This project consists of removal of existing unit ventilators and the
installation of new HVAC units at
Pre-Bid Conference: January 3, 2008 10 a.m.
Location Gemmell Student Center Room 246,
Clarion, PA
Bids Due and Opened: January 17, 2008 2 p.m.
Deliver To: Thorn II Building – Beside Public Safety
Additional
Information: Notice to Contractors
Addenda Issued: January 10, 2008
![]()
Page Last Updated 12/12/2007
(Every attempt has been made
to ensure accuracy and reliability of the data contained in the information
provided on this web page and attachments hereto. In addition,
information is constantly being added and/or updated.