Project No.
|
Project Name/Description
|
Date of Award
|
Contractor
|
Amount
|
|
CL-643
|
DESIGN
SERVICES for New Dining Hall
|
12/21/06
|
STV Architects
|
$798,000.00
|
|
CL-629
|
EGBERT HALL
RESTORATION Rebid
restoring
the masonry walls, repair of the slate roof, eaves and fascia, refinishing
stairwell walls, installation of a doorway between two offices
|
2/15/07
|
C&D
Waterproofing
|
$189,650.00
|
|
CL-634
|
BECKER HALL EXT WALL
RECONSTRUCTION
refurbish the existing east and courtyard walls of Becker Hall
|
2/15/07
|
R.G.Friday, Inc.
|
$90,187.00
|
|
CL-645
|
GIVAN
HALL TRANSFORMER replace transformer and installation
of new electrical service
|
03/09/07
|
Fuellgraf Electric Co.
|
$121,950.00
|
|
CL-641
|
HART
CHAPEL ROOF REPLACEMENT & MASONRY RESTORATION replacement of the slate roof, replacing EPDM roofs,
restoration of the exterior masonry, paint exterior windows/trim, renovate
two interior stairwells and installation of exterior lighting
|
04/13/07
|
Ramp
Construction
|
$237,000.00
|
|
CL-642
|
STEVENS
HALL/SPECIAL ED BUILDING EXT,RESTORATION
Project includes restoration of all
exterior masonry at both Stevens Hall and the Special Ed Building, Sealant
joint replacement at perimeters of all door and window openings for both
buildings. Complete removal of ballasted membrane roof and replacement with
new insulation and EPDM on Special Ed Building, includes perimeter
reconstruction of wood blocking, installation of new aluminum fascia and
trim, exterior portland cement soffit at entries will be repaired and repainted, two
existing light fixtures to be removed and replaced. Becker Hall-sealant
replacement at joints between stone surrounds and brick at each of door and
window openings0
|
04/04/07
|
Hope Ridge Construction
|
$149,000.00
|
|
CL-644
|
STILL
HALL HVAC COMPUTING SERVICES AREA
The project consists of installing
two fan coil units for ventilation in the space now used for offices in the
formally designated “Main Frame”
room. Relocate one Liebert cooling unit to better
serve the electronic server equipment area. Provide new ceiling and
lighting along with two new VAV boxes and ductwork to serve historically
cold areas at the end of the air distribution system in the east wing.
These contracts include HVAC (CL-644.2) and Electrical (CL-644.4) work. The
HVAC Contractor is the Lead Contractor on this Project.
|
04/02/07
|
644.2
Curwensville H&P
644.4 Climax
Electric
|
$41,400.00
$10,165.00
|
|
CL646
|
STILL
HALL WINDOW REPLACEMENT
This project will provide for the
removal and installation of selected windows and doors in Still Hall. Since
the building will be occupied during construction care needs to be taken to
minimize risk or disruption of classes/activities in the building
|
04/02/07
|
Architectural
Window Concepts
|
$257,440.00
|
|