DATE
OF ISSUE:
April 21, 2008
NOTICE
TO CONTRACTORS
submit sealed proposals for: CL-668, Davis Hall Roof Replacement
![]()
Sealed proposals will be received at
office no later than 2:00 p.m. on the date of bid opening.
![]()
Brief Description: The General Contractor is the single
prime contractor for this project. The
General
Contractor’s work includes
all work for the project. The work
includes, but is not necessarily limited to the
following:
Contractor
shall remove existing roofing membrane, roof insulation and all terminations
and
flashing indicated on drawings.
Contractor shall provide all disposal and recycling of demolition
materials and new construction waste as
much as is feasible. Provide new EPDM membrane
roofing system with new vapor barrier,
roof insulation as well as all new terminations and applicable
details as indicated.
University Contracting Officer: The University Contracting Officer for
this Project is:
W.
Finance
and Administration
Opening Date and
Time: 2:00 P.M., May 28, 2008
Pre-bid
Conference: A
pre-bid conference will be held on Monday May 12th, 2008 at
10:00 A.M. McEntire Conference Room, Clarion, PA. Directions
to
campus
are available by contacting the University Project Representative,
Joe
Brinkley, at 814/393-2026. The pre-bid
meeting will be the only site
visit
conducted by the University and the only review of plans and
specifications.
All
Contractors are urged to attend.
Contract Nos./Cost
Range: CL-668.1 –
General: $239,550
MBE\WBE REAA
Participation Levels: CL-668.1
– General: $
23,995
Bid Guaranty: 5% of bid
amount
Proposal Period: 60 calendar days allowed from Bid Opening
until Award of Contract
Contract Approval Period: 120 calendar days allowed
from Bid Opening until Notice to Proceed
Proposed Date of Completion: 60 calendar
days from Date of Notice to Proceed.
Liquidated Damages: The
Contractor shall pay to the System, as liquidated damages and not as a penalty,
the amount of $
500.00 for each and every calendar
day beyond the specified
number
of calendar days of completion.
Professional: Weber
Murphy Fox, Inc.
Plans Cost/Contact:
$65 nonrefundable, by
check payable to
Contact for Bid and
Specification Information:
Bidders' Services: Plans
and specifications are available for review at McEntire Maintenance,
Street,
CONTRACTUAL
REQUIREMENTS
Bid Guaranty:
It has been determined by the University that for this work a bid
guaranty is required. As a bid guaranty,
each Proposal must be accompanied by a Certified Check, Bank Cashier's Check or
BID Bond. If a Bid Bond is submitted, it must be in the amount of 5% of the
contract bid proposal amount, and it MUST be submitted on the System furnished
Bid Bond Form. FAILURE
to submit a bid guaranty; or, if the Bid Bond is used as a Bid Guaranty,
failure to submit the completed (all signatures and seals) System-furnished Bid
Bond Form may result in the rejection of the Bid Proposal as non-responsive.
Performance and Payment Bonds:
Performance
and Payment Bonds in the amount of the contracts are required for work
performed under the contracts awarded for this project. Bond requirements are contained in Rider
F-Contract Bonds of the System's Standard Form of Agreement for Facilities
Projects.
Nondiscrimination
The State
System of Higher Education is an equal employment opportunity agency with
special nondiscrimination requirements, as published in the Commonwealth
Contract Compliance regulations 22 PA Code Chapter 509 and in the State System
of Higher Education Contract Compliance Requirements contained in the bid
proposal form.
Debarred Contractors:
Contractors
currently under suspension or debarment by the Commonwealth, any other state,
or the federal government are not eligible for an award of contract for this
project. Additionally, contractors
should not contract with or employ subcontractors or individuals that are
currently under suspension or debarment by the Commonwealth or the federal
government. A current list of suspended
or debarred contractors is available by contacting the Department of General
Services, Office of Chief Counsel,
Product Substitution:
Any
product substitution requests shall be submitted to the design professional a
minimum of ten (10) calendar days prior to the date set for receipt of bid
proposals. Those product substitutions that
are accepted will be published in an addendum.
After the bid opening, product substitutions will be considered only for
those conditions listed in Section 01631-Product Substitutions.
MBE\WBE Participation:
The Contractor
must demonstrate that he has complied with the State System of Higher Education
Draft Regulation Minority Business and Women Business Enterprise (MBE/WBE) in
facilities projects, as outlined in the bid proposal form, in the preparation
and submission of their bid proposals.
All
bidders must directly contact certified MBE/WBE subcontractors and/or suppliers
to request quotes. Bidders must solicit
MBE/WBE firms in a timely manner to allow sufficient time for a response, in
the same manner bidders solicit from other subcontractors and suppliers. In order
for a
solicitation to be considered a qualified proactive solicitation, it must
contain the following minimum information:
1. The solicitation must be written, and on
the bidder's business letterhead
2. The date of solicitation indicated
3. The name and address of MBE\WBE firm
solicited
4. The project name and number
5. A listing of the specific equipment,
materials and/or supplies, including appropriate quantities, that the bidder
intends to purchase or lease. The scope
of work for any subcontract work should be clearly outlined.
6. Instructions as to where the plans and
specifications (if not attached) are available to be reviewed.
Information regarding the availability
of certified Minority and Women Business Enterprise (MBE/WBE) may be obtained
form the