STATE
SYSTEM OF HIGHER EDUCATION
ISSUE DATE: April 15, 2008
PROJECT
NO.: CL-657
PROJECT
NAME: Rhoades Hall/Frame Hall – Facility Locker Room and Restroom
Upgrade
BIDS
DUE:
3:00 p.m., April 23, 2008
ADDENDUM
NO. 1
TO:
Prospective Bidders
This Addendum forms a part of
the contract documents and modifies the original Contract documents issued
February 18, 2008. Please acknowledge receipt of this Addendum in the
space provided on the Bid Proposal form.
This addendum consists of six (6) pages with
attachments, Pre-Bid Minutes consisting of two (2) pages; and covers
modifications to:
TECHNICAL
SPECIFICATIONS
Table of Contents:
1. Division
16-ELECTRICAL SYSTEMS; The Section 16051
- General Generator Requirements (1 page) has been eliminated from the
specification and is not included.
Reference to this section in the Table of Contents for the Technical
Specifications is to be DELETED IN ITS ENTIRETY.
Bidding Requirements:
Contract Form – Standard
Form of Agreement:
1.
Rider A: Standard Form of Agreement is to be DELETED IN ITS
ENTIRETY. Substitute
revised
Rider A, attached to this Addendum, into the Contract Documents.
Division 1 - General Requirements:
ASBESTOS-CONTAINING
MATERIALS WHICH HAVE BEEN IDENTIFIED, BUT WHICH MAY NOT BE ALL INCLUSIVE,
INCLUDE FLOOR TILE AND MASTIC AT THE
VESTIBULES OF FRAME HALL TOILET ROOMS, FLOOR TILE AND MASTIC IN THE FRAME HALL
JANITOR’S CLOSET, FLOOR TILE AND MASTIC AT THE ENTRY AREA BETWEEN THE RHOADES
HALL LOCKER ROOMS, FLOOR TILE AND MASTIC IN THE EXISTING OFFICE ADJACENT TO THE
RHOADES HALL MEN’S LOCKER ROOM, AND INSULATION AT MECHANICAL PIPING ELBOW
JOINTS IN CONCEALED SPACES AT BOTH RHOADES AND FRAME HALL, UP TO A MAXIMUM OF
100 ELBOW JOINTS FOR BOTH LOCATIONS. ALL ASBESTOS ABATEMENT, INCLUDING INSULATION
ON MECHANICAL SYSTEMS, WILL BE THE WORK OF THE GENERAL CONTRACTOR.
…
ALL WORK ON THIS PROJECT MUST BE COMPLETED WITHIN NINETY (90) CALENDAR DAYS THE
ISSUANCE OF THE NOTICE TO PROCEED. NOTE THAT THE FOLLOWING WORK AREAS ARE
REQUIRED TO BE COMPLETED IN THEIR ENTIRETY AND TURNED OVER TO THE UNIVERSITY BY
NO LATER THAN AUGUST 15TH, 2008.
THESE AREAS INCLUDE ALL WORK IN THE RHOADES HALL MULTI-PURPOSE ROOM
(G29) AND ADJACENT CORRIDOR (G23), AND ALL WORK IN THE FRAME HALL TOILET ROOM
RENOVATION (G-15, G-17, AND G-19). THE
DATE OF THE LETTER WILL…
Division 10-Specialties:
B. Warm-Air Dryer (Hand drying only, at Frame
Hall Toilet Rooms):
1. Delete first subparagraph below if not applicable. Coordinate with specification method selected
at the beginning of this Article.
Basis-of-Design
Product: American Specialties, 0195.
2. Mounting: Surface mounted, with maximum projection of 4
inches.
3. Nozzle: Fixed, with maximum projection of 4” from
wall.
4. Operation: Electronic-sensor activated with timed power
cut-off switch.
a. Operation
Time: Maximum of 30 seconds.
5. Cover
Material and Finish: Cast iron, with
enamel finish in color selected by Architect.
6. Electrical
Requirements: Adjusts 100-240 V, 19A at
120V (2020 W).
C. Warm-Air Dryer (Hand and hair drying, at
Rhoades Hall Locker Rooms):
1. Delete first subparagraph below if not applicable. Coordinate with specification method selected
at the beginning of this Article.
Basis-of-Design
Product: American Dryer, Inc., Model
A70.
2. Mounting: Surface mounted.
3. Nozzle: 360 degree revolving nozzle.
4. Operation: Push-button operated with timed power cut-off
switch.
a. Operation
Time: Maximum of 80 seconds.
5. Cover Material and Finish: Cast iron, with enamel finish in color
selected by Architect.
6. Electrical
Requirements: Adjusts 100-240 V, 19A at
120V (2020 W).
DRAWINGS
Drawing AD1.0 DEMOLITION PLANS (RHOADES HALL)
1.
Drawing 2/AD1.0 -
Demolition Plan @ Men’s Locker Rooms;
The extent of removal of asbestos-containing floor tile and mastic is to
be increased to include the floor area in the existing office at the southeast
corner of the existing Men’s Locker Room (G17).
A note is to be added at the location of this office to read as follows:
COMPLETELY
REMOVE FLOOR TILE FINISH AND MASTIC IN THIS AREA. NOTE: THESE MATERIALS HAVE BEEN IDENTIFIED AS
ASBESTOS-CONTAINING.
2.
Drawing 2/AD1.0 -
Demolition Plan @ Men’s Locker Rooms;
The extent of removal of asbestos-containing floor tile and mastic at
the location of the Entry Area (G23) is to be extended to include the floor
area of the existing Locker Room door vestibules, and the area of the existing
drinking fountain recess.
3.
General Notes on
Asbestos Abatement; The General Note No.
1 is to be modified to include additional abatement at Frame Hall, and is to
read as follows:
ASBESTOS-CONTAINING
MATERIALS ARE KNOWN TO EXIST IN THE WORK AREA, AND INCLUDE FLOOR TILE AND
MASTIC IN THE ENTRY AREA BETWEEN THE LOCKER ROOMS, AND FLOOR TILE AND MASTIC AT THE EXISTING OFFICE ADJACENT TO THE MEN’S
LOCKER ROOM. IN ADDITION THERE IS
ASBESTOS-CONTAINING PIPING ELBOW INSULATION (FIBERGLASS ENCASED) IN THE
CONCEALED SPACES. COMPLETE ABATEMENT
OF ALL OF THESE ITEMS IS TO BE UNDER THE CONTRACT FOR GENERAL CONSTRUCTION, AND IS TO INCLUDE ABATEMENT OF UP TO 100
PIPING ELBOWS TOTAL IN BOTH RHOADES HALL AND FRAME HALL WORK AREAS.
Drawing A2.2 INTERIOR ELEVATIONS AND DETAILS
Door No. Remarks
1/G18 20 Min. Rated
2/G23 20 Min. Rated
1/G25 20 Min. Rated
Drawing FR-A1 FLOOR PLANS (FRAME HALL)
2. General
Notes on Asbestos Abatement; The General
Note No. 1 is to be modified to include additional abatement at Frame Hall, and
is to read as follows:
ASBESTOS-CONTAINING
MATERIALS ARE KNOWN TO EXIST IN THE WORK AREA, AND INCLUDE FLOOR TILE AND
MASTIC IN THE VESTIBULE ENTRY AT EACH OF THE TOILET ROOMS, FLOOR TILE AND MASTIC AT THE CUSTODIAL CLOSET, AND FLOOR TILE AND
MASTIC TO THE TILE JOINT APPROXIMATELY 4” INTO THE CORRIDOR (WHICH IS IN
CONTACT WITH MODIFICATIONS TO THE DOOR FRAMES AND PARTITION WALLS). IN ADDITION THERE IS ASBESTOS-CONTAINING
PIPING ELBOW INSULATION (FIBERGLASS ENCASED) IN THE CONCEALED SPACES. COMPLETE ABATEMENT OF ALL OF THESE ITEMS IS
TO BE UNDER THE CONTRACT FOR GENERAL CONSTRUCTION, AND IS TO INCLUDE ABATEMENT OF UP TO 100 PIPING ELBOWS TOTAL IN BOTH
RHOADES HALL AND FRAME HALL WORK AREAS.
Drawing H-2 FRAME HALL-HVAC
Drawing P-2 FLOOR PLANS-FRAME HALL
OFFSET
EXISTING 4” RWC AND RECONNECT TO
EXISTING RWC BELOW FLOOR THIS AREA (VERIFY EXACT LOCATION AT SITE). EXISTING
2” PVC BENT PIPE WITHIN EXISTING JANITOR CLOSET G17 SHALL BE RELOCATED ALONG
WITH EXISTING CAST IRON RAINWATER LEADER.
COORDINATE FINAL LOCATION WITH OWNER.
Drawing E1 GROUND FLOOR DEMOLITION PLAN (RHOADES HALL)
Drawing E3 NEW GROUND FLOOR PLAN
Drawing E4 NEW FIRST FLOOR PLAN (Rhoades Hall)
1. This drawing
is to be DELETED IN ITS ENTIRETY.
Substitute revised Drawing E4 – New First Floor Plan (Rhoades Hall)
attached to this Bulletin, dated 14 April 2008, into the Contract
Documents. Revisions to this drawing
include, but are not limited to, the following:
a.
Revised lighting
layout for the Multi-Purpose Room (G29).
Drawing E6 FRAME HALL-GROUND FLOOR
NEW
RECESSED DOWNLIGHT TO BE FURNISHED AND
INSTALLED BY E.C. CONNECT AS SHOWN
ON THE DRAWING.
***
BASE
BIDS
CONTRACT CL-657.1 – GENERAL BASE
BID NO. 1
All work complete as shown on the drawings and described in the specifications, for the sum of:
___________________________________________ Dollars $_________________________
(WRITTEN) (FIGURES
CONTRACT CL-657.1 – GENERAL BASE
BID NO. 2
All work complete as shown on the drawings and described in the specifications, for the sum of:
___________________________________________ Dollars $_________________________
(WRITTEN) (FIGURES
CONTRACT CL-657.1 – GENERAL BASE
BID NO. 3
All work complete as shown on the drawings and described in the specifications, for the sum of:
___________________________________________ Dollars $_________________________
(WRITTEN) (FIGURES
CONTRACT CL-657.2 – HVAC
BASE BID NO. 1
All work complete as shown on the drawings and described in the specifications, for the sum of:
___________________________________________ Dollars $_________________________
(WRITTEN) (FIGURES)
CONTRACT CL-657.2 – HVAC
BASE BID NO. 2
All work complete as shown on the drawings and described in the specifications, for the sum of:
___________________________________________ Dollars $_________________________
(WRITTEN) (FIGURES)
CONTRACT CL-657.2 – HVAC
BASE BID NO. 3
All work complete as shown on the drawings and described in the specifications, for the sum of:
___________________________________________ Dollars $_________________________
(WRITTEN) (FIGURES)
Page 3 of 19
CONTRACT NO. CL-657.3 – PLUMBING BASE
BID NO. 1
All work complete as shown on the drawings and described in the specifications, for the sum of:
___________________________________________ Dollars $_________________________
(WRITTEN) (FIGURES)
CONTRACT NO. CL-657.3 – PLUMBING BASE
BID NO. 2
All work complete as shown on the drawings and described in the specifications, for the sum of:
___________________________________________ Dollars $_________________________
(WRITTEN) (FIGURES)
CONTRACT NO. CL-657.3 – PLUMBING BASE
BID NO. 3
All work complete as shown on the drawings and described in the specifications, for the sum of:
___________________________________________ Dollars $_________________________
(WRITTEN) (FIGURES)
CONTRACT NO. CL-657.4 – ELECTRICAL BASE
BID NO. 1
All work complete as shown on the drawings and described in the specifications, for the sum of:
___________________________________________ Dollars $_________________________
(WRITTEN) (FIGURES)
CONTRACT NO. CL-657.4 – ELECTRICAL BASE
BID NO. 1
All work complete as shown on the drawings and described in the specifications, for the sum of:
___________________________________________ Dollars $_________________________
(WRITTEN) (FIGURES)
CONTRACT NO. CL-657.4 – ELECTRICAL
BASE
BID NO. 1
All work complete as shown on the drawings and described in the specifications, for the sum of:
___________________________________________ Dollars $_________________________
(WRITTEN) (FIGURES)
Page
3-a of 19
TO BE FILLED IN IF ADDENDA ARE ISSUED:
The bidder acknowledges receipt of the addenda
hereinafter enumerated which have been issued during the period of bidding and
agrees that said addenda shall become a part of this contract. The bidder shall list below the numbers and
issuing dates of the addenda received:
Addenda No. Issuing Date
_________________________ _________________________
________________________ ________________________
__________________________________________________
Bidder - Insert Firm Name
Page 3-b of 19
***
STATE
SYSTEM OF HIGHER EDUCATION
STANDARD
FORM OF AGREEMENT
RIDER A
SCOPE OF WORK TO BE PERFORMED
This Rider is intended to be prepared individually for each contract,
and tailored specifically to the scope of work to be performed.
1.
This project is CL-657 to provide
interior renovations (Locker Room and Restroom) at specific areas at both Frame
and Rhoades Hall and will consist of three base bids.
2.
Work included under this project applies to two
locations at Venango Campus of Clarion University of Pennsylvania,
Work shall include the Contractor furnishing all supervision, labor, and materials, tools and equipment and performing all work necessary to complete this installation to the satisfaction of the system. This is a multiple prime contract project and shall be a General Construction Contract. (CL-657.1), Heating and Ventilating Contract (CL-657.2), Plumbing Contract (CL-657.3), Electrical Contract (CL-657.4). The work includes, but is not necessarily limited to the following:
1. Contract No. CL-657.1 General
Construction. The General
Construction work includes all items of general construction at specific areas
at both Frame and Rhoades Hall. The work
includes but is not necessarily limited to the following:
a.
This Contractor shall identify and remove all
asbestos-containing materials located in the areas of work of the existing
structures, and shall allow for such in their bid. All abatement shall be performed in strict
accordance with all requirements and regulations of governing local, state, and
federal authorities. An Asbestos Survey
Report is attached to the Contract Documents and identifies all
asbestos-containing materials identified within the two buildings. This contractor shall review the existing
facility to confirm the report.
Asbestos-containing materials which have been identified, but which may
not be all inclusive, include floor tile at the vestibules of Frame Hall toilet
rooms, piping joint insulation at Frame Hall mechanical systems, and floor tile
at the entry area between the Rhoades Hall locker rooms. All asbestos abatement, including insulation
on mechanical systems, will be the work of the General Contractor.
b.
This Contractor shall provide all necessary selective
demolition at the Ground Floor Toilet Rooms of Frame Hall in order to
accommodate the new construction indicated, including but not limited to;
removal of walls, doors, partitions, ceilings, floor finishes, wall finishes,
accessories, miscellaneous items, and all other selective demolition as
required and indicated.
c.
This Contractor shall provide all necessary selective
demolition at the Men’s and Women’s Locker Rooms and adjacent corridor of Rhoades
Hall in order to accommodate the new construction indicated, including but not
limited to; removal of walls, doors, partitions, ceilings, floor finishes, wall
finishes, accessories, miscellaneous items, and all other selective demolition
as required and indicated.
d.
This Contractor shall provide work required for the
complete renovation of the Ground Floor Toilet Rooms of Frame Hall, including
but not limited to; preparation of selectively demolished surfaces for new
construction, reconfiguring and providing new walls, new doors, new toilet and
shower partitions, new suspended ceilings, new hard ceiling finishes, new floor
finishes (including ceramic tile), new wall finishes, new accessories (either
furnished and installed or installing Owner-supplied items), and all other
items as required and indicated.
e.
This Contractor shall provide work required for the
complete renovation of the Men’s and Women’s Locker Rooms and adjacent corridor
of Rhoades Hall, including but not limited to; preparation of selectively
demolished surfaces for new construction, reconfiguring and providing new walls
(including structural glazed tile), new doors, new toilet and shower
partitions, new suspended ceilings, new hard ceiling finishes, new floor
finishes (including ceramic tile), new shower stalls with waterproofed
installation, new wall finishes, new accessories (either furnished and
installed or installing Owner-supplied items), new metal lockers, new benches,
and all other items as required and indicated.
f.
This Contractor shall provide work required for the
complete re-painting of the existing ceiling and adjacent items at the
Multi-Purpose Room of Rhoades Hall, including but not limited to; preparation
of surfaces to be painted as indicated, protection of surfaces to remain, painting
of ceiling surfaces, trusses, ceiling-mounted ductwork, and other items
indicated for repainting.
2. Contract No. CL-657.2 Heating and
Ventilation Construction. The
Heating and Ventilating Construction work includes all items of heating and
ventilating work at specific areas at both Frame and Rhoades Hall. The work includes but is not necessarily
limited to the following:
a. This Contractor shall provide all necessary selective
demolition at the Ground Floor Toilet Rooms of Frame Hall in order to
accommodate the new construction indicated, including but not limited to;
removal of heating systems, exhaust systems, and all other selective demolition
as required and indicated.
b.
This Contractor shall provide all necessary selective
demolition at the Men’s and Women’s Locker Rooms and adjacent corridor of
Rhoades Hall in order to accommodate the new construction indicated, including
but not limited to; removal of heating systems, exhaust systems, and all other
selective demolition as required and indicated.
c.
This Contractor shall provide work indicated for the
complete renovation of the Ground Floor Toilet Rooms of Frame Hall, including
but not limited to; heating system and associated ductwork, exhaust system and
associated ductwork, controls, and all other items as required and indicated.
d.
This Contractor shall provide work indicated for the
complete renovation of the Men’s and Women’s Locker Rooms and adjacent corridor
of Rhoades Hall, including but not limited to; heating system and associated
ductwork, exhaust system and associated ductwork, controls, and all other items
as required and indicated.
e.
This Contractor shall provide work indicated for the
complete removal and replacement of the existing emergency generator at Rhoades
Hall, including but not limited to; all mechanical work indicated for
ventilation and/or breeching, and all other work items as required for new
installation and as indicated.
3. Contract No. CL-657.3 Plumbing
Construction. The Plumbing
Construction work includes all items of plumbing work at specific areas at both
Frame and Rhoades Hall. The work
includes but is not necessarily limited to the following: