Freshman 4-1-1

Text Alert

Get Connected

2009-3-22

Construction updates for the week are provided below.

 

Science Tech 2009-2-20 

 

 

Clarion Campus – Science-Technology Building - Science-Technology Center WebCam

Landscape development began this week along Greenville Avenue.  The work is concentrating on the ground from the center entrance to Greenville Avenue to the Davis Roadway with the intent to install the sidewalks in the area under development, to complete the side entry courtyard and to establish a grass turf.  As a result the construction trailers have had to be moved and campus parking relocated.  Interior construction also continued with the contractors applying epoxy flooring to the penthouses, ceiling and lab furniture installation, finishing work in the atrium, and painting in the east stairwell. HVAC controls in the penthouses and in the mechanical room continues and this past week the contractor supplying and installing the solar panels visited the site and to verify the available space. 

Ven Suites 2009-2-20

Venango Campus – Residence Suites

The roof structure and moisture wrap are complete for both buildings with window installation, interior framing and blocking nearly complete as well.  Interior rough-in and soffit and fascia installation is now underway.  Masons will begin their work shortly.

 

 

 

 

 

 

Ven Pond 2009-03-22

Venango Campus – Venango Pond

A railing is soon to be installed on the walkway to the pond.  The pond and associated dam are working as designed.

 

 

 

 

 

 

 

 

Rhoades 2009-03-22 

 

Venango Campus – Rhoades Locker Room

The locker room is on hold as glazed block to match the existing surfaces is delayed with only one company able to manufacture it.  The doors have been installed and the gym is available for events.

Photos and information on projects provided by Dave Fagan and Joe Brinkley.

WebCams provided by University Relations.

 

More information about construction can be found in the minutes of the regular meetings of the Facilities Planning Committee and Parking Committee, provided below:

 

Facilities Planning:      http://www.clarion.edu/32034/  

 

Parking:                       http://www.clarion.edu/57809/

 

Naming Opportunities Available

 

Naming opportunities are available for projects. For additional information about supporting Clarion’s building program, please contact Chuck Desch, Development Officer, at 814-393-2572.

 

Paul Bylaska

Vice President for Finance & Administration

218 Carrier

Clarion University

Clarion, PA 16214

pbylaska@clarion.edu

TEL:  (814) 393-2240

FAX: (814) 393-1826